Careers
Careers
Comfortable working conditions: social guarantees, career growth, professional development and training
Artar Construction offers comfortable working conditions: social guarantees, career growth, professional development and training.
How to apply
Write to us in the chat on this page: tell us about yourself and your experience. We will contact you after reviewing your application.
Open vacancies
There are no open vacancies right now. Tell us about yourself — we will contact you when a suitable one appears.
Training and career growth
At the company you can grow from scratch into a sought-after specialist or manager. Many employees start with no experience, learn the trade on the job and move up to higher positions over time.
-
Start in the trade
Begin with no experience and learn an in-demand specialty
-
Skills and income growth
With experience come a higher position, more responsibility and a higher salary
-
Mentoring
Experienced employees help newcomers settle in faster
-
Career growth
Many of the company’s managers started in blue-collar trades
Career path example
- General laborer (no experience) Start
- Dump truck driver
- Excavator operator
- Foreman
- Shift supervisor
- General laborer (no experience) Start
- Installer
- Lead installer
- Foreman
- Shift supervisor
Types of work
- 13
- types of work
- 4
- stages
- 63
- processes
Stage 01 01–03
Preparation and zero cycle
Site grading
Main processes · 5
- Removal of the topsoil and vegetation layer
- Excavation
- Grading with a grader or bulldozer
- Layer-by-layer compaction with a roller
- Embankment construction
External networks
Main processes · 4
- Earthworks
- Installation of external utility networks
- Construction of wells, chambers and equipment
- Installation of substations and stations
Foundation
Main processes · 7
- Concrete preparation
- Waterproofing
- Reinforcement (with embedded parts and anchor blocks)
- Concreting
- Pilot drilling
- Pile driving
- Construction of pile caps
Stage 02 04–07
Frame and envelope
Steel structures
Main processes · 5
- Installation of steel structures along the axes
- Installation of columns, beams, girders, purlins and bracing
- Installation of trusses and rafter structures
- Welding and bolting
- Installation of profiled sheeting on roofs and floors
Floor slabs
Main processes · 3
- Reinforcement and concreting of basement walls and floor slabs
- Waterproofing and insulation of basement walls
- Fire-retardant coating of steel structures
Sandwich panels and windows
Main processes · 4
- Preparation and marking of installation points
- Installation and fastening of sandwich panels
- Installation of window units and sealing of joints
- Protective and finishing works around installed elements
Galleries, roofing, screed, masonry
Main processes · 5
- Laying of roof thermal insulation and waterproofing
- Laying of floor heat and sound insulation
- Semi-dry floor screed
- Installation of apartment and corridor galleries
- Brick and aerated concrete masonry of walls and shafts
Stage 03 08–10
Engineering systems
Ventilation and heating
Main processes · 6
- Installation of supply, exhaust and supply-exhaust units
- Installation of air ducts and air distribution devices
- Laying of heating pipelines
- Installation of heating appliances
- Installation of boiler equipment and heat substations
- Installation of central and local air conditioning systems
Water supply and sewerage
Main processes · 5
- Soldering of polypropylene pipes (hot and cold water supply, hot water circulation)
- Soldering of HDPE pipes (storm drainage)
- Assembly of PVC pipes (sewerage)
- Assembly of steel pipes with grooved joints (fire-fighting pipeline)
- Welding for the fire extinguishing system
Electrical works
Main processes · 3
- Laying of electrical networks
- Installation of electrical equipment
- Plastering, puttying and priming of surfaces
Stage 04 11–13
Finishing, landscaping and handover
Finishing
Main processes · 3
- Laying of porcelain stoneware tiles
- Laying of quartz vinyl tiles
- Installation of gypsum wall panels
Landscaping
Main processes · 7
- Installation of curbstones
- Construction of sidewalks
- Asphalt concrete paving
- Installation of road signs
- Installation of small architectural forms
- Greening of the territory
- Road marking
Terminal devices, commissioning, furniture
Main processes · 6
- Installation of low-voltage systems
- Installation and connection of terminal devices
- Installation of furniture
- Installation and connection of plumbing fixtures
- Installation of doors, wall hatches and fittings
- Commissioning of low-voltage systems
Specialties
Click a specialty to apply in the chat.
Construction and installation specialties
9 specialtiesHeavy equipment operators
13 specialtiesFrequently asked questions
What are the requirements for candidates?
We grow our own people, so you can join with no experience. There are also vacancies for experienced specialists.
What documents are needed?
A Russian passport, SNILS, INN and an extract from the electronic employment record.
Is a medical examination required?
Yes. Once your application is approved, you will need to pass a medical examination.
How is employment formalized?
Officially, under the Labor Code of the Russian Federation.
How do I apply?
Write to the chat on this page: tell us about yourself and your experience, and we will pass your resume on to the manager.
Didn’t find a suitable vacancy?
Tell us about yourself and your experience — we will pass your CV to the manager.