Construction of residential and non-residential buildings
Construction of roads and highways
Utility installation by HDD
Earthworks and site grading
Reclamation of solid waste landfills and sludge fields
Design bureau

Careers

Careers

Comfortable working conditions: social guarantees, career growth, professional development and training

Artar Construction offers comfortable working conditions: social guarantees, career growth, professional development and training.

How to apply

Write to us in the chat on this page: tell us about yourself and your experience. We will contact you after reviewing your application.

Open vacancies

There are no open vacancies right now. Tell us about yourself — we will contact you when a suitable one appears.

Training and career growth

At the company you can grow from scratch into a sought-after specialist or manager. Many employees start with no experience, learn the trade on the job and move up to higher positions over time.

  1. Start in the trade

    Begin with no experience and learn an in-demand specialty

  2. Skills and income growth

    With experience come a higher position, more responsibility and a higher salary

  3. Mentoring

    Experienced employees help newcomers settle in faster

  4. Career growth

    Many of the company’s managers started in blue-collar trades

Career path example

Heavy equipment department
  1. General laborer (no experience) Start
  2. Dump truck driver
  3. Excavator operator
  4. Foreman
  5. Shift supervisor
Construction and installation department
  1. General laborer (no experience) Start
  2. Installer
  3. Lead installer
  4. Foreman
  5. Shift supervisor

Types of work

Stage 01 01–03

Preparation and zero cycle

3 types of work · 16 processes

Site grading

Main processes · 5

  • Removal of the topsoil and vegetation layer
  • Excavation
  • Grading with a grader or bulldozer
  • Layer-by-layer compaction with a roller
  • Embankment construction

External networks

Main processes · 4

  • Earthworks
  • Installation of external utility networks
  • Construction of wells, chambers and equipment
  • Installation of substations and stations

Foundation

Main processes · 7

  • Concrete preparation
  • Waterproofing
  • Reinforcement (with embedded parts and anchor blocks)
  • Concreting
  • Pilot drilling
  • Pile driving
  • Construction of pile caps
Next: Stage 02 · Frame and envelope

Stage 02 04–07

Frame and envelope

4 types of work · 17 processes

Steel structures

Main processes · 5

  • Installation of steel structures along the axes
  • Installation of columns, beams, girders, purlins and bracing
  • Installation of trusses and rafter structures
  • Welding and bolting
  • Installation of profiled sheeting on roofs and floors

Floor slabs

Main processes · 3

  • Reinforcement and concreting of basement walls and floor slabs
  • Waterproofing and insulation of basement walls
  • Fire-retardant coating of steel structures

Sandwich panels and windows

Main processes · 4

  • Preparation and marking of installation points
  • Installation and fastening of sandwich panels
  • Installation of window units and sealing of joints
  • Protective and finishing works around installed elements

Galleries, roofing, screed, masonry

Main processes · 5

  • Laying of roof thermal insulation and waterproofing
  • Laying of floor heat and sound insulation
  • Semi-dry floor screed
  • Installation of apartment and corridor galleries
  • Brick and aerated concrete masonry of walls and shafts
Next: Stage 03 · Engineering systems

Stage 03 08–10

Engineering systems

3 types of work · 14 processes

Ventilation and heating

Main processes · 6

  • Installation of supply, exhaust and supply-exhaust units
  • Installation of air ducts and air distribution devices
  • Laying of heating pipelines
  • Installation of heating appliances
  • Installation of boiler equipment and heat substations
  • Installation of central and local air conditioning systems

Water supply and sewerage

Main processes · 5

  • Soldering of polypropylene pipes (hot and cold water supply, hot water circulation)
  • Soldering of HDPE pipes (storm drainage)
  • Assembly of PVC pipes (sewerage)
  • Assembly of steel pipes with grooved joints (fire-fighting pipeline)
  • Welding for the fire extinguishing system

Electrical works

Main processes · 3

  • Laying of electrical networks
  • Installation of electrical equipment
  • Plastering, puttying and priming of surfaces
Next: Stage 04 · Finishing, landscaping and handover

Stage 04 11–13

Finishing, landscaping and handover

3 types of work · 16 processes

Finishing

Main processes · 3

  • Laying of porcelain stoneware tiles
  • Laying of quartz vinyl tiles
  • Installation of gypsum wall panels

Landscaping

Main processes · 7

  • Installation of curbstones
  • Construction of sidewalks
  • Asphalt concrete paving
  • Installation of road signs
  • Installation of small architectural forms
  • Greening of the territory
  • Road marking

Terminal devices, commissioning, furniture

Main processes · 6

  • Installation of low-voltage systems
  • Installation and connection of terminal devices
  • Installation of furniture
  • Installation and connection of plumbing fixtures
  • Installation of doors, wall hatches and fittings
  • Commissioning of low-voltage systems

Specialties

Click a specialty to apply in the chat.

Frequently asked questions

What are the requirements for candidates?

We grow our own people, so you can join with no experience. There are also vacancies for experienced specialists.

What documents are needed?

A Russian passport, SNILS, INN and an extract from the electronic employment record.

Is a medical examination required?

Yes. Once your application is approved, you will need to pass a medical examination.

How is employment formalized?

Officially, under the Labor Code of the Russian Federation.

How do I apply?

Write to the chat on this page: tell us about yourself and your experience, and we will pass your resume on to the manager.

Didn’t find a suitable vacancy?

Tell us about yourself and your experience — we will pass your CV to the manager.